Gallery and Museums

NASCAR Hall of Fame
ESP provided Level A and Level B SUE services in support of site construction. Utilities were located adjacent to a proposed retaining wall which had tie-in beams extending toward Brevard Street. Level A Vacuum excavation was performed at critical locations to avoid damage to existing utilities during the construction of the retaining wall.

Extensive utility locating was performed within the Brevard Street corridor, requiring traffic control coordination and street cut procedures.





Copyright © 2021 by E.S.P. Associates, Inc.
All rights reserved. All content subject to change without notice.